Select 2A project is at the closing stage. The project manager asks the team to perform closing functions at the next meeting. Which two procedures will the project team perform? (Choose two.)
Show answer
Answer: CD
Certified Associate in Project Management497 questions across 50 pages are complete and free, with no account or card.
497 questions in this bank
Free access · progress saved on this device
A project is at the closing stage. The project manager asks the team to perform closing functions at the next meeting. Which two procedures will the project team perform? (Choose two.)
Answer: CD
A project manager is assigned to a new project with a defined scope. The project requires advanced planning at the start of the project. Which approach should the project manager select for the project?
Answer: B
In adaptive projects, who should approve the prioritization of the backlog?
Answer: A
A project team working on an automobile manufacturing project is detailing the parts needed for a car door design. The door is composed of several parts that have to be developed in sequence, as the frame is needed before other parts can be designed and built. What activity is the team involved in?
Answer: C
What should be completed when the work-in-progress (WIP) limit is reached and new work has been requested?
Answer: B
What are the three components of a work breakdown structure (WBS) dictionary? (Choose three.)
Answer: CDE
The three components of a Work Breakdown Structure (WBS) dictionary are: Description of work: This includes detailed descriptions of the work and technical documentation for each WBS element. It provides clarity on what needs to be done for each component of the project. List of resources: It details the resource requirements for the project, which can include labor, materials, equipment, or any other resources necessary to complete the work. Acceptance criteria: This outlines the conditions that must be met for the project deliverables to be accepted. It ensures that the work meets the required standards and specifications.
Source: Adapted from community discussion — Vangelis_1980
A business analyst is evaluating solutions against the expected results and logging defects along the way. The next task is to analyze the discrepancies prior to facilitating a go/no-go decision. Which technique should be used as a starting point to uncover problem areas?
Answer: C
A project manager engages a highly specialized resource who is in a different location and cannot join the regular team meetings. This is leading to delays in productivity. How can the project manager assist the team to resolve the issue?
Answer: D
A business analyst is looking to uncover the root cause of a specific problem. What technique should the business analyst apply first?
Answer: A
Which method should be used to elicit a cross-functional requirement?
Answer: D