Question 471 · 504 in bank
Refer to the exhibit.

What must be connected to clear the HA NOT READY status?
Show answer
Answer: B
Explanation
Reference: https://ucsguru.com/2012/11/07/ha-with-ucsm-integrated-rack-mounts/
Implementing and Operating Cisco Data Center Core Technologies (DCCOR)504 questions across 51 pages are complete and free, with no account or card.
504 questions in this bank
Free access · progress saved on this device
Refer to the exhibit.

What must be connected to clear the HA NOT READY status?
Answer: B
Reference: https://ucsguru.com/2012/11/07/ha-with-ucsm-integrated-rack-mounts/

Refer to the exhibit. Which action completes the vPC domain implementation?
Answer: A
You don't need to create another VRF, VRF mgmt already exits for default and the int mgmt0 it's already a menber of the VRF, so C is incorrect. https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus9000/sw/6-x/interfaces/configuration/guide/b_Cisco_Nexus_9000_Series_NX-OS_Interfaces_Configuration_Guide/b_Cisco_Nexus_9000_Series_NX-OS_Interfaces_Configuration_Guide_chapter_0111.html
Source: Adapted from community discussion — Ron_Berserker
Refer to the exhibit. A network engineer is implementing a configuration checkpoint on a Cisco Nexus 9000 Series Switch. The configuration must skip any existing vPC configuration errors and must complete if there are any configuration errors. The engineer finished the vPC domain configuration part. Which command completes the checkpoint implementation?
Answer: A
SP-03(config)# rollback running-config checkpoint zizu ? *** No matching command found in current mode, matching in (exec) mode *** atomic Stop rollback and revert to original configuration (default) best-effort Skip errors and proceed with rollback stop-at-first-failure Stop rollback at the first error verbose Show the execution log
Source: Adapted from community discussion — Zi04
An engineer must implement a VXLAN-based data center interconnect. The long-distance transport provided by a service provider is IP-based, supports a maximum MTU of 1554 bytes, and does not support outbound traffic replication. Which action must be taken to build the data center interconnect?
Answer: D
An engineer must perform an initial configuration of VXLAN Tunnel End-Point functionality on the Cisco Nexus 9000 Series platform. All the necessary features are already enabled on the switch. Which configuration set must be used to accomplish this goal?
Answer: D
D is correct, bcs it's the only one which creates a NVE interface, which is the virtual interface in Nexus family which creates a VTEP (a vtep per vxlan)
Source: Adapted from community discussion — mauchi
An engineer must perform a software upgrade on a production Cisco Nexus 7000 Series Switch. Before the upgrade activity, the requirement is for all ports to be shut down and routing protocols to terminate gracefully. Which feature must be used to meet these requirements?
Answer: C
DRAG DROP -

Refer to the exhibit. An engineer must monitor the Ethernet port and the corresponding VLAN traffic for the hyper4 device. The SW3 device is a Cisco Nexus 7000 Series Switch. Drag and drop the code snippets from the right into the boxes in the configuration to meet these requirements. Select and Place:
This is an interactive task on the real exam — a drag-and-drop, hotspot or ordering question. There is nothing to select here, so the answer is shown below for reference.
Answer: See figure below

DRAG DROP - Drag and drop the network assurance concepts from the left onto the corresponding benefits on the right. Select and Place:

This is an interactive task on the real exam — a drag-and-drop, hotspot or ordering question. There is nothing to select here, so the answer is shown below for reference.
Answer: See figure below
DRAG DROP - An engineer must configure HSPR protocol on two Cisco Nexus 9000 Series Switches running a virtual port channel. In addition, the HSRP implementation must meet these requirements: ✑ It must allow more than 500 groups. ✑ switch1 must act as the primary switch. ✑ Both switches must use a user-defined hardware address. Drag and drop the commands from the right to complete a configuration of the HSRP on the left. The commands are used more than once. Not all commands are used. Select and Place:

This is an interactive task on the real exam — a drag-and-drop, hotspot or ordering question. There is nothing to select here, so the answer is shown below for reference.
Answer: See figure below
Reference: https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus9000/sw/6-x/unicast/configuration/guide/l3_cli_nxos/l3_hsrp.html

An engineer must configure OSPFv2 connectivity between a pair of Cisco Nexus switches. The connection between the switches must meet these requirements: ✑ Use unicast for updates. ✑ Use decentralized communication of updates. ✑ Full adjacency between switches. Which configuration is needed to meet these requirements?
Answer: C
C is correct A Virtual Link is an OSPF tunnel, a multi-hop point-to-point unicast adjacency; it is, in essence, an extension of Area 0 across (transit area) another area.
Source: Adapted from community discussion — GuyThatTakesDumps
Keyboard:J Kmove between questionsA–Dselect an answerRshow or hide the answer← →change page
350-601 practice, question 471. 504 questions available.
Version 1.0.0. How we source questions