SIMULATION - Guidelines - This is a lab item in which tasks will be performed on virtual devices. • Refer to the Tasks tab to view the tasks for this lab item. • Refer to the Topology tab to access the device console(s) and perform the tasks. • Console access is available for all required devices by clicking the device icon or using the tab(s) above the console window. • All necessary preconfigurations have been applied. • Do not change the enable password or hostname for any device. • Save your configurations to NVRAM before moving to the next item. • Click Next at the bottom of the screen to submit this lab and move to the next question. • When Next is clicked, the lab closes and cannot be reopened. Topology -

Tasks - The operations team started configuring network devices for a new site. Complete the configurations to achieve these goals: 1. Ensure that port channel Po1 between DISTRO-SW01 and DISTRO-SW02 is operational using the LACP protocol. Configuration changes for this task must be made on DISTRO-SW01. 2. Ensure that traffic on VLAN 10 is carried as untagged traffic between DISTRO-SW01 and DISTRO-SW02. 3. Complete the Rapid-PVST+ configuration on DISTRO-SW2 by ensuring it it the secondary root switch for all VLANs in the range of 1 to 1005. DISTRO-SW01 -

DISTRO-SW02 -

This is an interactive task on the real exam — a drag-and-drop, hotspot or ordering question. There is nothing to select here, so the answer is shown below for reference.